Maybe some of you want that posts on blogger are arranged based on post title in alphabetical order starting from a to z, or the other way. In blogger / blogspot, this is impossible because blogger always displays posts by date order. Post with the latest date or the most recently created one is placed at the top, and so on until the oldest articles.
So if you want to change the order of posts should be done by changing the date, as follows:
- Login at blogger.com.
- Click on Edit Posts.
- Click the Edit link next to a post that you will change its date.
- Now you are on the editor page. At the bottom of the editor, click the Post Options link, and then select the Automatic option under the Post date and time. This will change the date of that post to the current datevand time.

- Publish your post.
- Now open your blog and see that post should be located at the top.
Good luck.
No comments:
Post a Comment